Building Trust Through Quality & Innovation

We are a large company that has retained its small company values of exemplary work for a competitive price. We appreciate the value of customer communication and guarantee that you will find our quality of service matches our high standards of workmanship

Template 2

We Have A Specialist For Your Job

SWBC employ a dedicated team of specialists to cover every aspect of building and maintenance – that means we can assist with everything from aleaky tap to full renovations on listed properties requiring specialist building skills and materials.

Template 3

We Care About Our Customers & Employees

As part of our dedication to quality, health, safety and client satisfaction SWBC have been awarded with many accreditations. SWBC are Safe Contractor approved.

Template 4

Make Sure Your Engineer is Gas Safe Registered

At SWBC all our plumbing & heating engineers are Gas Safe registered. Gas safety is one of the most important factors in having a safe home and work place. The dangers that surround unsafe gas appliances are deadly serious.

Template 1

Fire Damage Insurance Works

An insured customer’s property suffered extensive damage following a house fire in September 2010. There was substantial fire damage to the rear of the property, causing damage to the roof, dormer structure, and bedrooms. The lower levels including kitchen, living room, and bathroom also needed major works.

The refurbishment project began in January 2011with strip-out works being carried out while materials were sought. The strip-out included removal of all damaged roof tiles and beams, and removal of all debris from exterior and interior, including ceilings, kitchen units, doors, and skirting.

Once these works were completed, the local council were consulted and we began rebuilding and securing the dormer section of the house. New windows were then installed and all external rainwater goods reinstated.

Once all external works were completed and following consultation with the customer regarding finishes, the internal works could begin. A full electrical rewire took place along with the fitting of a new combination boiler. Fittings included the reconstruction of the en-suite, kitchen, and bathroom, and the construction of new stud walls and ceilings. Plasterwork was then carried out, and all floors doors and skirting refitted so the decoration work could begin.

At the final stage, extensive paint work and tiling was carried out and the property cleaned and handed back to the customer. The timescale set by the insurers was met and the client was able to move back into the property on the date expected.

Photo Gallery

  • Joinery Division
    BEFORE: Kitchen
  • Featured Projects
    AFTER: Kitchen
  • Joinery Division
    BEFORE: Main Bedroom
  • Featured Projects
    AFTER: Main Bedroom
  • Joinery Division
    BEFORE: Living Area
  • Featured Projects
    AFTER: Living Area
  • Joinery Division
    BEFORE: En-Suite
  • Featured Projects
    AFTER: En-Suite

Latest News

Health & Safety Awareness

Being one of Wales premier safety-conscious builders our credentials speak for themselves as we’ve recently been included on SAFECONTRACTOR’s list of approved contractors

SWBC Projects

Featured project concerning refurbishment of extensively fire-damaged home now added to site.